thekillerj23
Supporter
- 10,277
- 11,445
Results should be pretty noticeable unless it was only very minorly yellow. Are you sure you're doing it right? Make sure after you apply the RIT, let the shoe air out for a good 12-16 hours before touching it again. Make sure it's completely dry before doing the next session. Also remember it'll initially yellow after applying the RIT and it'll brighten after sitting and airing out.My 00 concords mesh was fairly yellow, just did my 2nd application of rit, have not seen any major changes, maybe after 4-5 applications, i do 1 a day
I'll post pics later but that is the video i watched too. I waited 24 hours between my sessions. I think my issues is I get the shoe too damp with water, too much soap and water, and then scrub it down with a lot of Rit. Could that be an issue?